This activity defines alternate routes for a Laserfiche entry based on a timeout period or timeout date for inactivity. You can define one route for an entry before a timeout period is met and another route for after.
This activity contains two branches by default: a primary branch and a deadline branch. When the deadline is met, the primary branch is canceled and the deadline branch is processed instead.
You can add additional deadline branches, but additional primary branches cannot be added.
How does this activity look in the Designer Pane?
To add this activity to a workflow definition
To configure this activity
Optional: You can also assign connection information for this activity.
For further help or feedback, please see the Laserfiche Support Site. | © 2010 Laserfiche, Inc. All Rights Reserved. |